RIFLINE complete Part 2
21 May
The complete relay system, with a consistent plug-in design, ensures high machine and system availability.
21 May
The complete relay system, with a consistent plug-in design, ensures high machine and system availability.
21 Mar
Are you looking for a basic monitoring relay that is ideal for simple monitoring tasks such as currents, voltages, 1- and 3 phases and phase sequence suitable for use in the building installation and in the production of machines and plants?
21 Mar
Would you like to have relays that enable quick and tool free cable wiring time?
Would you like to have relays that have the features of the terminal blocks such as marking materials, bridges and test adapters?
Would you like to have an option to transform a basic relay into a timer relay with three different functions?
26 Feb
The seminar session will focus on the establishment of the appropriate SIL (Safety Integrity Levels) and the subsequent selection of functional safety applications as established by and described in Safety Integrity Level procedures in accordance with SIL IEC-61508/61511 guidelines.
It will be the first time Phoenix Contact S.E.A. is organizing a 6 hour hands-on workshop that will introduce the purpose and application principles for implementing Safety Integrity Levels (SIL) in process safeguarding systems.
This in depth and insightful discussion will be hosted by Mr. Cees Rienstra, an expert in SIL applications, and industry consultant, retired from Royal Dutch Shell Holland.
Who will benefit from this session?
Process-Engineering, Design/Engineering and Operations/Maintenance professionals
When?
09th April 2013, Tuesday in Indonesia
11th & 12th April 2013, Thursday & Friday in Singapore
16th April 2013, Tuesday in Malaysia
If you are interested or wish to find out more information, please contact us through the comments section and we will get back to you.
Connect with Phoenix Contact